Pioneer Landerhaven
Mayfield Hts., Ohio

Tec Inc. provided mechanical engineering services to complete the HVAC system design for the renovation of the three-story corporate office building. And provided the electrical engineering services to complete the interior lighting and general building power requirements.

Mechanical engineering included reworking the ventilation system in the kitchen to eliminate odor problems.  The ductwork distribution in the dining room was redesigned to allow the ceiling height to be increased.  The toilet room ventilation was modified to improve the air flow.  The existing building temperature control system will be upgraded. The exisitng rooftop units were utilized for the remodel.

Tec's lighting designers replace the majority of the existing lighting with latest technology, energy efficient fixtures, suitable for the high density CRT environment. The lighting designers also made fixture selections for several specilaty areas of the facility.

Electrical engineering included replacing the existing fire alarm system, security system design and tele/data system wiring.